NYP high viscosity pump installation and commissioning of the need to pay attention
NYP high viscosity pump installation and commissioning of the need to pay attention
High viscosity pump for the petroleum, chemical , paint , oil , pharmaceuticals , dyes, food and other industries.
Applications include transporting organic acids, fatty acids, alkaline substances, caustic soda , soda water , polymers, soap , shampoo, animal fat , vegetable oil , chocolate and other special fluids.
Let's look at matters NYP high viscosity pump installation should be noted , in addition, we need to debug NYP high viscosity pump to protect it NYP high viscosity pump to work properly.
NYP high viscosity pump flange or abutment should be used with a common drive motor mounting base , foundation or bearing flange having sufficient rigidity is required , to reduce vibration and noise generated during operation of the gear pump . Motor and gear pump shall be connected with a flexible coupling , concentricity of less than 0.1 mm , the tilt angle of not more than 1 degree. Coupling may not be used when installing a hammer to avoid damage gear pump gear and other parts. If using pulleys , sprockets and other drive bays support should be set up to prevent the pinion gear bearing by radial forces. Fastening gear pump, the motor ground screw , screw force should be uniform , reliable connection . When turned by hand couplings, gear pumps should feel able to easily rotate , no clamping or other abnormal phenomena before you can pipe . Suction pipe diameter NYP high viscosity pump should be large enough and avoid sharp bends or narrow passages , reducing elbow, removing unnecessary valves , fittings, pumps reduce mounting height as possible to shorten the length of the suction pipe to reduce the pressure loss. Sealing pipe joints and other components to be good , to prevent air intrusion, thereby controlling cavitation and cavitation occurs.
NYP high viscosity pump before the start of the operation , to the internal gear pump casing filled with the liquid to be transported for safe start. If the ambient temperature is below freezing , the pump should advance to pass into the hot steam , preheating before starting the gear pump. The direction of rotation of the gear pump to the inlet and outlet ports consistent . Gear pumps if the first run , or long-term idle before use , the best start and under no-load or low load conditions Unity hours. If the running-in phase advance notice abnormal temperature, leakage , vibration and noise , you should stop to check .
The check valve and the output valve in the pipeline to install a gear pump is preferably a check valve . So that when access to the pump and the output pipe system liquid back does not occur. Gear pump with a load stop, rewind and also prevent the pump generates a partial vacuum in its output pipe . It should be noted that the outlet check valve is not installed backwards or appear stuck. Export pipeline NYP high viscosity pump should also set a safety valve and other protective devices , so that once the pump outlet passage blocked, you can open the safety valve relief . Safety valve and pump or pump cover can cast one, also can be fitted separately. The need for reversing the NYP high viscosity pump , its import and export pipeline are required to set up a safety valve .
TaiBang production NYP high viscosity pump , high viscosity pump , high viscosity gear pump in the well-known brands, products exported to over 110 countries and regions, ranking the forefront of the quality and quantity of high-grade products. Trustworthy ! ...